IEC 61439 / EN 61439
IEC 61439 / EN 61439
 
 
IEC 61439 / EN 61439
1

Working Tools and Checklists

 
 

Step 1: Collecting all the project data

Checklist to design switchgear assemblies

Checklist to design switchgear assemblies
 

Step 2: Assembly design and design verification

International Catalogue No. 17

Planning tool Configurator ENYGUIDE

Calculation tool for the design verification of the permissible temperature rise

 
International Catalogue No. 17

HENSEL supports you with the free planning software ENYGUIDE. Allows the quick and easy configuration of distribution boards.

Design verification of permissible temperature rise according to IEC 61439-1 / EN 61439-1
The tool automatically calculates the power dissipation and installed power dissipation, and where appropriate, the RDF.

 

Step 3: Assembly / manufacture of the distribution board

Assembly of ENYSTAR Distribution Boards up to 250 A

Assembly of Mi Power Distribution Boards up to 630 A

Routine Test Report

 

Step 5: Documentation

Declaration of EC Conformity ENYSTAR

Declaration of EC Conformity ENYSTAR

Declaration of EC conformity

Declaration of EC conformity

Declaration of EC Conformity for Mi Power Distribution Boards

Declaration of EC Conformity for Mi Power Distribution Boards

Checklist for conformity assessment procedure

Checklist for conformity assessment procedure
 
 
 

www.hensel-electric.de

Visit the website of Gustav Hensel GmbH & Co. KG and get more Information about the company and the products and services.

 

© Gustav Hensel GmbH & Co. KG